Biggs Army Airfield Lighting / Runway Improvements

Construction / Case Studies / Federal /

Biggs Army Airfield Lighting / Runway Improvements

Fort Bliss, TX

  • Prime subcontractor for $1,069,369 Ft. Bliss Airport Lighting and Runway repairs
  • Project included R and R REIL light Foundation
  • Demo PAPI light bases, relocate and reinstall
  • R and R REIL light submersible transformer and controller
  • R and R every other transformer on the 03 Threshold Lights and determine wiring problem
  • R and R Sequence Light Flasher Control Panel (included misc repairs to individual unit controllers)
  • R and R Sequence Flasher Control cable
  • Demo Taxiway Sign Base and raised to grade R and R concrete on Taxiway E
 